1、当装置的玻璃钢化粪池埋到深度达R1.2米时,地上的荷载为公路II级,假如荷载超出公路II级时路面需求添加保护措施,实际情况由装置的技术人员断定。
1, when the device of glass fiber reinforced plastic septic tanks to buried depth of R1.2 meters, ground load for highway class II, if the load is beyond the requirements of class II when road add protective measures, the actual situation by technical personnel that device.
2、玻璃钢化粪池装置到地下1.2米时,假如上面有车辆经过,路面需添加结构保护措施,实际情况由装置的技术人员断定。
2, glass fiber reinforced plastic septic tanks device to the ground 1.2 meters, if the above were the vehicles through, pavement structure need to add protective measures, the actual situation by technical personnel that device.
3、埋设深度核算(如停示)及管道衔接阐明核算公式参照如下:(进水管上管顶距化粪池罐顶100mm,出水管上管顶距化粪池罐顶150mm)。无地下水H=H1+d+100,H1=h+100;有地下水H=H1+d+100+200,H1=h+100
3, embedding depth calculation (such as stop) and pipe connection to elucidate on the calculation formula for reference as follows: (feed line pipe is 100 mm from septic tank roof, tube in the outlet pipe is 150 mm) from septic tank roof. No H = H1 + d + 100 of groundwater, H1 = H + 100; There are groundwater H = H1 + d + 100 + 200, H1 = H + 100
4、买家在定货时,需求向卖家供给化粪池管道的尺度,所买的化粪池在出厂之前,厂家担任由罐体接出衔接收300mm,由罐体至进出水检查井的衔接由需方完结,管道衔接参照UPVC管道工程技术规程。
4, buyers in order, the requirements to the sellers supply the scale of the septic tank pipe, buy by the septic tank before leaving the factory, the factory as by can pick up the cohesion 300 mm, the tanks to check in and out of the water well cohesion made by buyer's end, pipe bridging reference UPVC pipe engineering discipline.
5、玻璃钢化粪池的排气管参照国标05s702图集制造。
5, glass fiber reinforced plastic septic tanks of exhaust pipe reference gb 05 s702 atlas of manufacturing.
6、检查井做法可参照《建筑设备施工装置通用图集》“排水工程”中有关做法。
6, check well practice can consult atlas of construction equipment construction equipment general "drainage engineering related.
7、玻璃钢化粪池的并联:当化粪池容积超越50m3时,可以使两个单罐并连在一起。(两罐体距离不小于600mm,其它做法同单体做法)。