安装玻璃钢化粪池需要注意的事项
安装玻璃钢化粪池需要注意的事项
施工流程
The construction process 
  1.回填达到施工规范要求池体上可砌清掏井(检查井),清掏井有砖砌井和组台式预制钢筋混凝土井两种。
Backfill the construction specification requires that the body of the pool can be lined up (check the well), and the two kinds of concrete Wells are made of brick Wells and platform prefabricated reinforced concrete Wells. 
  2.检查井为防止砖砌井壁渗漏,要求井的内、外壁做防水砂浆抹面层,厚20mm(1:2防水砂浆,内参水泥重量的5%的防水剂),阴角处抹45。斜面,厚50mm,有地下水时,在井外壁涂抹热沥青(或其他防水涂料)两道,最后覆土至地坪要求。
2. Brick wall to prevent leakage of inspection Wells, the requirements of well do waterproof mortar plastering layer, internal and external wall of 20 mm thick (1:2 waterproof mortar, 5% by weight of the internal cement waterproofing agent), Yin with 45 Angle. Inclined plane, thick 50mm, have ground water, apply hot asphalt (or other waterproof coating) on the outside wall of the well, and then cover the ground to the ground level.
 施工注意事项
Construction considerations 
  1.开挖基槽时,应掌握地质情况。
The geological condition should be mastered when excavating the base tank. 
  2.玻璃钢化粪池设置位置及埋深采应严格按设计要求放线、定位。
The position of the glass and steel septic tank and the buried depth should be set in strict accordance with the design requirement. 
  3.玻璃钢化粪池就位后,要及时回填土,罐体内灌满水,以防位移。回填土要求进行过筛,无尖角石块和建筑垃圾,无地下水时,接土质密度0.95夯实。特别注意罐体下四周用素土或黄砂填实:有地下水时,罐体下用素土或黄砂填实,罐体固定位置受力均匀。
After the glass and steel septic tank is in place, return to fill the soil in time and fill the tank with water in case of displacement. The backfill soil is required to be sieving, with no pointed stones and construction waste, and no ground water, the soil mass density of 0.95 compacted. Special attention to the filling of soil or yellow sand in the surrounding area of the tank: when there is ground water, the tank will be filled with plain soil or yellow sand, and the tank will be evenly distributed. 
  4.在雨季施工时,要有排水设施,防止基坑积水及边坡坍塌,同时将罐体内注满水防止漂浮,而造成位移。
During the construction of the rainy season, there should be drainage facilities to prevent the accumulation of water from the foundation pit and the collapse of the slope, and fill the tank with water to prevent floating, and cause displacement. 
  5.施工应遵照有关工程施工及验收规范的规定进行。
The construction shall be carried out in accordance with the regulations on construction and acceptance of the construction.